Prime Minister Nguyen Xuan Phuc and different delegates on the inauguration ceremony (Picture: VNA)
Hanoi (VNA) – Prime Minister Nguyen
Xuan Phuc on January 9 lower the ribbon to place the connection trade
Belt Highway No three and the Hanoi-Hai Phong Expressway in operations.
The interchange, situated within the districts of Lengthy Bien and Gia
Lam, has two routes: a 1.5 km part linking Lengthy Bien-Thach Ban to the
motorway, and one other part of 620 m connecting Belt street n ° three and the
Expressway.
The mission is anticipated to shorten journey occasions on the route and
totally exploit the funding effectivity of Belt Highway No three, Hanoi-Hai Phong
Categorical means and Co Linh Highway.
They are going to assist cut back site visitors jams and revitalize the town
socio-economic improvement.
The mission, with an funding of greater than 402 billion VND (17.5
million USD), was authorized in June 2020 and accomplished two months sooner than
program./.
VNA